LIST OF PREVIOUS WORKS:

CIVIL,IT,SUPPLIES AND ELECTRICAL ENGINEERING WORKS.

S/N

DESCRIPTION

CLIENT /YEAR

 

1.

Supply and installation of a 12kw solar hybrid power systetm

At federal medical centre keffi

Trinity Energy solutions and projects Ltd.

Completed.

7th January,2012

 

2.

Emergency Construction of Concrete Lined Drain and Reinstatement of eroded Shoulder at Mile 2 Area (Ch.2+300) along Abeokuta – Rounda road in Ogun State

 C/N: SR/12-992

FERMA

Completed in 2013

 

3.

Emergency Repairs of Owo – Ipele – Ifon – Sobe – Okeluse Road (Section I) in Ondo State

C/N: SR/ 12-430

FERMA

Completed in 2013

 

4.

Special Repairs of Critical failed sections along Ibadan – Idi Ayunre – Mamu Road (Km.0+000 – Km.31+000) in Oyo State

C/N: SR/12-1208

FERMA

Completed in 2014

 

5.

Emergency Repairs and Pavement Strengthening of Berliet at Ch.13+080 – Ch.13+550 (Oshodi Bound) along Apapa – Oworonshoki Dual Carriageway in Lagos State

C/N: ESR/13-143

FERMA

Completed in 2014

 


S/N

DESCRIPTION

CLIENT/ DATE

 

6.

Construction of 145kv SF6 Circuit breaker-CB, 145kv capacitive voltage transformer-CVT, 145kv Bus Post Insulators-BPI, 145kv Current Transformers-CT, 120kv Lightening Arrester-LA Civil Foundations at lot 21-1:132/33kv Substation Nsukka in Enugu State

RENACS Eng’g Nig. Ltd.

Completed in 2013

 

7.

SUPPLY AND INSTALLATION OF A 3.5KVA POWER BACKUP SYSTEM.

Trinity Energy solutions and projects Ltd.

Completed.

11th May,2015

 

6.

SUPPLY AND INSTALLATION OF A 3.5KVA POWER BACKUP SYSTEM.

Trinity Energy solutions and projects Ltd.

5th August,2015.

 

8.

SUPPLY AND INSTALLATION OF A 3.5KVA POWER BACKUP SYSTEM.

Trinity Energy solutions and projects Ltd.

1st June,2015.

 

9.

SUPPLY AND INSTALLATION OF A 3.5KVA POWER BACKUP SYSTEM.

Trinity Energy solutions and projects Ltd.

1st  July,2015.

 

10

SUPPLY OF E-BOOKS TO RENACS’ CORPORATE HEAD QUARTERS AT PLOT 141 AMBROSE FEESE GUZAPE ABUJA, F.C.T.

Renacs Engineering NIG. Ltd.

19 th March , 2015

 

11

SUPPLY AND INSTALLATION OF FURNITURE AND ELECTRONICS IN THE STAFF QUARTERS OF THE ABOVE SITE.

Renacs Engineering NIG. Ltd.

7th March , 2017

 

12

NETWORK INSTALLATION,RELOCATION AND RE-COMMISIIONING OF THE WORKING EQUIPMENTS IN ALL RENACS BRANCH OFFICES.

Renacs Engineering NIG. Ltd.

25th JUNE , 2017

 

 

 

 

 

 